
Technical Approval & SLO for Wastewater and Emissions
Technical studies so wastewater and emissions meet quality standards, WWTP planning, and support for the Operational Feasibility Letter (SLO) once facilities are ready.
When are a Technical Approval and SLO needed?

- ✓Businesses discharging wastewater to water bodies or the sea, or applying it to land, need a technical approval for wastewater quality standards.
- ✓Businesses with stationary emission sources, such as boilers or process stacks, need a technical approval for emission standards.
- ✓Technical approvals are part of the AMDAL or UKL-UPL process, so they must be prepared before the environmental document is assessed.
- ✓Once the WWTP or emission control system is built and tested, an SLO is needed as proof the facility is fit to operate.
What we do for you

From quality standard studies and WWTP design to a facility fit to operate.
Our process
Information to prepare
It does not need to be complete. Send what you have and we will help list what is missing.
Questions about Technical Approval & SLO
Still have questions? Ask our team directly.
A technical approval is a government approval setting out the environmental protection standards that must be met, such as wastewater or emission quality standards. The procedure is set out in Ministerial Regulation 5/2021.
A Pertek is obtained at the planning stage as the basis for design and the standards to meet. An SLO is issued after the facility is built and trial results show the standards are met, confirming it is fit to operate.
It depends on the estate’s management scheme and your agreement with the central WWTP operator. We can review it based on the estate documents and your activity.
Yes. Beyond studies and permitting, we handle system planning and civil construction of waste treatment infrastructure.



