Storage area inside a warehouse
ServicesHazardous Waste Technical Details

Hazardous (B3) Waste Storage Technical Details

We prepare hazardous waste storage technical details for the temporary storage facility (TPS) at your site, from waste identification to submission support.

When it applies

Who needs hazardous waste storage technical details?

Metalwork in a production area
CertifiedISO 9001 · 14001 · 45001
  • ✓Businesses generating hazardous waste, such as used oil, used batteries, chemical packaging, fluorescent lamps, contaminated rags, or certain sludges.
  • ✓Hazardous waste generators that store waste temporarily before handing it to licensed parties.
  • ✓Businesses preparing an AMDAL or UKL-UPL, as hazardous waste storage technical details are included in the environmental approval.
  • ✓A new, relocated, or changed TPS, or changes in waste types and quantities.
Scope of service

What we do for you

01
Identification & inventory
Type, code, characteristics, and estimated generation of hazardous waste from each process.
02
TPS design & suitability
Location, construction, ventilation, spill channels and sumps, and waste segregation.
03
Packaging, symbols & labels
Packaging and marking requirements based on waste characteristics.
04
SOPs & logbook
Storage and emergency procedures, plus hazardous waste balance and logbook records.
05
Document preparation
Technical details prepared and aligned with your environmental documents.
06
Submission support
Submission, verification, and revisions until the technical details are approved.
Factory building with a stack
PT Enviro Resources Indonesia

Hazardous waste stored safely, recorded properly, and ready for verification.

ISO 9001 · 14001 · 45001Office in SidoarjoStudy to construction
How it works

Our process

01
Survey & identification
Reviewing processes and hazardous waste sources.
02
TPS evaluation
Assessing or designing the storage facility.
03
Technical details & SOPs
Preparing documents and procedures.
04
Submission & verification
Submission and responses to verification.
05
Implementation
Applying SOPs and record-keeping on site.
Preparation

Information to prepare

It does not need to be complete. Send what you have and we will help list what is missing.

✓Production processes and materials used
✓Types and estimated monthly quantities of hazardous waste
✓Existing or planned TPS: location, size, and photos
✓Site layout
✓Existing environmental documents
✓Contracts with licensed hazardous waste transporters or processors (if any)
Send your data via WhatsApp
FAQ

Questions about Hazardous Waste Technical Details

Still have questions? Ask our team directly.

A document setting out the technical requirements for storing hazardous waste at the generator’s site: waste types and quantities, TPS location and design, packaging, symbols and labels, and handling procedures. It refers to Government Regulation 22/2021 and Ministerial Regulation 6/2021.

The storage time limit depends on daily generation and the waste category. We set out the limits that apply to your business in the technical details and SOPs so they are easy to follow.

Hazardous waste obligations apply to every generator, including small businesses, with storage requirements scaled to the quantity generated.

Contact

Let's discuss your company's environmental needs